#1 in Distributing Specialty
Chemicals & Equipment

Email Us Today Free shipping on
all chemicals (48 states)

  Home > Cooling Water Chemicals > PreTreatment Chemicals >

Galvanized Cooling Tower Pretreatment - 5 Gallons
Neutral pH Iron Oxide Cleaner
Galvanized Cooling Tower PreTreatment Chemical - 5 Gallons


 
Alternative Views:


Galvanized Cooling Tower PreTreatment Chemical - 5 Gallons
Our Price: $399.99
Sale Price: $299.99
Savings: $100.00

Quantity in Stock:10


Availability: Usually Ships in 3 to 5 Business Days
Product Code: PRE-Q332-5
Qty:

Description Shipping & Transit Times
 

Cooling Tower PreTreatment Chemical

ChemWorld PRE-Q 332 is a stabilized liquid blend of polyphosphate, orthophosphate, and an organic corrosion inhibitor designed for the pretreatment of open recirculating cooling tower systems. Although pretreatment is recommended for most systems, it is particularly critical in those systems having galvanized cooling towers to prevent the formation of white rust.
  • Single product multi-component formulation.
  • Effectively passivates galvanized towers against white rust.
  • Saves time and money over conventional treatments.
This product comes in a 5 gallon pail. Please email us for a 55 gallon cost.

If you are pretreating a galvanized cooling tower, consider purchasing ChemWorld 101 Cooling Startup kit. This one click purchase kit includes the following:
  • One 5 gallon pail of ChemWorld Q-ALK-PC - This product is required to clean the debris and greases prior to startup.
  • One 5 gallon pail of ChemWorld 1334 - ChemWorld 1334 is scale and corrosion control cooling tower chemical. After startup you can perform testing of your water hardness and alkalinity and we can tune in your exact chemical for long term protection.
  • One 5 gallon pail of ChemWorld 56 - ChemWorld 56 is a 12.5% sodium hypochlorite product that is required to kill bacteria. This is the cheapest easiest product to get your system up and going, you can convert to tablets or a stablized bromide product after startup.
  • One LakeWood 140 Cooling Tower Controller - You will need to set the controller to feed and bleed the cooling tower water to maximize cycles and to minimize chemical usage rates. An optional dual biocide water treatment can be implemented after startup. This is model 1239597 (which is board mounted unit that has the flow assembly on the left).
  • One 1167435 Cooling Tower Blowdown Valve (1" NPT) - This will be required when the cooling tower calls to release cooling tower water.
  • Two Stenner 45MHP10 Adjustable Head Pumps - One pump is required for the corrosion/ scale prevention chemical and for the biocide. Each pump is rated to 100 psi, which should be enough to feed the chemical into the system. The ideal spot to feed the chemical is into the return header of the cooling tower. These Stenner Pump kits come with chemical injection valves that will allow for quick injection of each chemical into the side stream water loop that is used to monitor the cooling tower conductivity.
  • One complete CWTK-200 Cooling Water Treatment Test Kit. This kit is contains every test you will need to set up and fine tune your water treatment program.
  • One Chemical Metal Test Station Cabinet - You need to keep your test kits and lo sheets in one clean location. This test kit is ideal for cooling towers. Items in photo of test kit not included.
Frequently Asked Questions
What is the recommended Feed Rate for the Chemworld PRE-Q 332?
PRE-Q 332 is normally shot fed and added to the system at 34 lbs per 1000 gallons of system volume.
How long do I leave Pre-Q322 in the tower water?
We recommend recirculating the Chemworld Pre-Q322 for a minimum of 24 hours while the system is offline (no load). Longer circulation times are beneficial

Share your knowledge of this product. Be the first to write a review »